Has anyone written up the steps needed to get NUT working in SME 6? I want to use an APC Smart-UPS with a serial connection - I have a write-up for this combination to be installed and set up from scratch but I wondered if the NUT install in 6 is partially configured - anyone tried this and able to point me down the right road.
Ed Form