Thanks, I installed SME 7.1 on a test server (HP Proliant ML 350 G5 series, which is live with 2 domains and 100 users) which has E200i RAID controller and it is working fine now. I hope it doesn't give any problem while installing it on production server.
I would like to continue for some more days with ML 350 server (as it is live) and after testing the Blade server I would like to migrate my existing SME 7.1 from the test server to 7.2 on the production server i.e., Blade Server, can anyone please help me with the procedure for migrating it to another server with all the configuration existing of the ML 350. Is there any restrictions like the other server should have the same hardware, network configuration etc.. as the present??