After much procrastination I've built my production SME10, restored, added a couple of packages and checked what I can.
So far, so good as far as I can tell. The work station backup is scheduled as before and will presumably continue to backup, eventually replacing the old SME9's. (I do a rolling 3 time full backup)
Is there anything else I should quickly check before starting to collect mail ?
I can then turn off the old SME9 machine(s) ? (I run affa on a second machine, but that will have to wait).