Hi Mark,
I'm interested to find out whether you upgraded SmeSever in the end, and if so, ho it went.
I run a similar configuration here - a small old entry level Pentium PC with 64Mb RAM and a 900Mb disk (which is my problem - the disk is not quite big enough) running SmeServer 5.1.2 - and it works well.
I have been offered some old Compaq servers (Prolinea 1000s with 486DX2 66MHz CPUs, 100MB RAM, and 5 x 1GB SCSI RAID disks) The disks are appealing, and I've heard that x86 CPUs are supported - although of course P90 is the recommended minimum.
I've also been offerred an old Compaq ProSignia with a P150 CPU - but it only has 16MB RAM - and I don't feel like buying old 70ns SIMMS for it - I figure that if I have to spend money I may as well buy a 2nd hand PC performance wise.
Anyway - I tried loading the 5.6 CD on the ProLinea - and it failed from the floppy boot loader program - saying insufficent memory.
Do you think 5.5 might work, or should I stick with 5.1.2
One other person here suggested that 6.0 may have lower h/w requirements that 5.5 - any comments on that.
Thanks for feedback in advance.
Regards Andrew TD