There is something I don't understand about NUT and the UPS process. And I'm hoping you knowledgeable folk can elighten me.
In the normal course of events when a power failure occurs, (1) the UPS battery takes over, (2) when the battery gets low it signals NUT and NUT initiates a controlled shutdown, (3) the battery eventually goes flat, (4) the power gets restored and (5) because the server was set to boot on power restore, the SME Server boots.
In the case of a brief power flicker, we never get to step (2) and the server just continues to run.
My question has to do with the case where we complete step (2) and the server shuts down, but the grid power returns before step (3) completes. How does the server know to boot again?
Thanks for helping to clarify this for me.
John